.jpg)
Aries Energy prepares the full statutory package for classification and flag state approval, including General Arrangement, Fire Control, Life Saving Appliances, Escape Route, and Docking plans, along with tonnage, loadline, freeboard, and equipment number calculations. These documents are required before a class society or flag administration will approve a newbuild design for construction.
Yes. Tonnage calculations and plans, loadline calculations and plans, and freeboard calculations are all part of Aries Energy’s statutory plans and calculations service, and are required documentation for flag state vessel registration and classification.
Yes. Fire Control Plans and Life Saving Appliances Plans are explicitly listed among Aries Energy’s statutory deliverables, prepared to support the safety documentation classification societies and flag states require under SOLAS before certifying a vessel.
Both. The service page states statutory plans and calculations support newbuild vessel designs and conversions, since a converted vessel typically also requires renewed or updated classification and flag state approval documentation reflecting its modified configuration.