Aries Marine and Engineering Services

BALLAST WATER MANAGEMENT SAUDI

Ballast Water Management Saudi

Aries Marine and Engineering Services in Saudi offer ballast water management system. The aim of ballast water management system is to protect the marine atmosphere from the transfer of harmful aquatic organisms in ballasting operations of the ship.

Aries Marine in Saudi is implementing the ballast water management system on board ships. It can reduce harmful effects on the marine environment and eco system, that happens through aquatic microorganisms transferred from one geographical region to the other.

Aries Marine Saudi team have experienced engineers comprises of all necessary resources to complete the turnkey project. The sectors we serve include

  • Naval architecture
  • Marine engineering
  • Offshore engineering
  • Structural engineering
  • Mechanical engineering
  • Detailed engineering
  • Documentation and Management Services
  • Electrical instrumentation and telecom
  • Equipment trading and supply

Contents of Ballast Water Management System plan in Saudi

  • Location of ports providing shore discharge facility of sediments and ballast water
  • Duties of the personnel on board for carrying out blast operation
  • Operational procedure along with the method to be used for ballasting
  • The location at different coastal water for ballast exchange should be mentioned in the plan
  • Sampling point and treatment method should be given in the ballast water management system.

The advantages of Aries Marine in Saudi, is that the team has executed numerous similar projects in the past. A dedicated team is behind to execute the job professionally.